SML 2/2024
Small-scale gold mining.
- Holder
- AGT Mining and Development Company (SL) Limited
- Area
- 29.29 hectares
- Validity
- 2 May 2024 – 1 May 2036
- Location
- Kholifa Rowala Chiefdom, Tonkolili District
- Reference
- APL-I-1138
Sula Mountains, Sierra Leone
EP Mining & Development is moving from manual extraction to commercial gold production, with two 100 TPH washing plants and a fleet of 17 machines already acquired.
The project
Born from manual extraction, the project has grown into a structured mining operation. The goal: to become an established gold producer in Sierra Leone.
Investment to date covers land rights, permits, geological exploration, infrastructure and machinery. The company reports having completed the procedures required for its current operations.
The sites lie in the Sula Mountains, within Sierra Leone’s gold-bearing greenstone belts. Mineral exports reached USD 1.199 billion in 2023 (national atlas, citing SLEITI figures).
Regional context does not establish mineable resources on EP Mining’s holdings. Actual output must be confirmed in operations.
Regulatory framework
The two titles below come from the supplied register records and are shown with their exact status.
Small-scale gold mining.
Exploration for gold and associated minerals (MMDA 2023).
The active licence supports the current project. The pending application concerns expanded exploration; its status will be updated once the relevant authority confirms it officially.
Engineering
Engineers carried out on-site investigations into gold content and deposit quality, then designed a customised 100 TPH plant (Engima, Casablanca).
| Component | Model / specification | Qty |
|---|---|---|
| Three-side feed hopper | 26.3 m³ | 1 |
| Vibrating feeder | DN38096 | 1 |
| Belt conveyors | B800 × 15 m · B650 × 15 m | 2 |
| Trommel scrubber | JXSC-1550 | 1 |
| Screens | DN1845 high-frequency · DN1545 vibrating | 2 |
| Sluice box with vibrator | B1500 × 6 m | 1 |
| Sluice box | B1000 × 6 m | 3 |
| Slurry pump | 8/6 | 1 |
| Centrifugal concentrator | STLB-100 | 1 |
| Shaking table | 1845 | 1 |
The site
General arrangement: washing plant on the highest level, gravel stockpile, workshop, smelting area, parking and a secured perimeter with CCTV and lighting.
The process flow runs from unloading into the hopper, through washing and separation and storage in water basins, to loading, transport and gold processing.
Installations 8,594 m² (sum of the listed zones) · circulation 6,586 m² · remaining 2,820 m² (derived from the listed figures).
This is a proposed concept: the plateau, roads, foundations, haul routes and site services remain to be built. Geometry, pit access, drainage and area allocations require engineering validation.
Fleet
According to the company, all machines are customs cleared and stored near the site, awaiting transport.
| Equipment | Qty |
|---|---|
| Caterpillar 966H wheel loader | 1 |
| 330D excavator | 1 |
| D8R bulldozer | 1 |
| 320C excavators | 4 |
| HOWO dump trucks | 2 |
| Additional front loaders | 3 |
| Gottwald crane | 1 |
| Fuel truck | 1 |
| Corporate fleet | 3 |
| Total | 17 |
Roadmap
Phased execution, starting after the rainy season.
Secure site access, confirm the transport route and prepare the plateau.
Earthworks and stable foundations built for long-term use.
Move machinery and plant from nearby storage to site.
Install and commission the processing plants and site services.
Ramp up and confirm results through measured production.
Production outlook
These are planning assumptions based on previous testing and planned capacity, not verified operating results. Production, costs and profitability depend on actual recovery rates, gold prices, site conditions and operating performance.
Investment opportunity
Site access, civil works and preparation for reliable operations.
Foundations and installation of the processing plant infrastructure.
Transport, delivery and set-up of critical equipment and supporting assets.
Operations, labour, consumables and commissioning through to initial production.
Staged, disciplined deployment to reduce development risk. A detailed use of proceeds and the investment structure are available on request.
Transparency
| Risk area | Current approach |
|---|---|
| Licence status | Active mining licence in place; exploration application pending. |
| Production confirmation | Start with measured production to confirm results. |
| Infrastructure | Site design completed; mobilisation planned. |
| Seasonality | Phased execution after the rainy season. |
The Foundation is part of the company’s intended commitment to sustainable regional development: community infrastructure, local road access and energy-related projects, coordinated with stakeholders and neighbouring communities.
Visit the Foundation’s websiteInitiatives remain subject to consultation, budgets, permits and implementation. Planned benefits are distinct from completed, measured results.
Next steps
EP Mining & Development invites interested investors and partners to review the project and discuss the proposed investment.